Integration of power equipment for the "the Belt and Road" of China Laos Railway

Apr.03.2025

The China Laos Railway starts from Kunming, Yunnan Province, China in the north and ends at Vientiane, the capital of Laos in the south. The whole line adopts Chinese technical standards and consists of Kunyu Section, Yumo Section and Boten Section. The mileage of the line is 400 km, the proportion of bridges and tunnels is 62.6%, and the design speed is 160 km/h. Usually, the travel time from Vientiane to Boten is only 3 hours.

中老铁路1.jpg

Multinational railways are faced with changeable outdoor environment, and infrastructure plants have higher requirements for stability, durability and reliability of electricity.

The comprehensive power communication system solution has met the technical requirements of the high-speed railway project, and has been highly recognized by customers both in terms of technology and practical application.

  • 5b53c42c4b498337f4e93217a973be88_.jpg
  • 92ff3b7ed1699e84619c59f8184ab7ad_.jpg
  • 7394eb8b0c6dcc819a2ab6ece1a88fb9_.jpg